top of page
HOME PAGE > MILESTONES
![top-img-min.jpg](https://static.wixstatic.com/media/7a5d1a_96e303b2cc11458098967c3b694c87ad~mv2.jpg/v1/fill/w_980,h_295,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/top-img-min.jpg)
SHARE
Milestones
![Başlık (16).png](https://static.wixstatic.com/media/7a5d1a_3d4e90a7170f4d79a867b4b20ab5d807~mv2.png/v1/fill/w_980,h_346,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/Ba%C5%9Fl%C4%B1k%20(16).png)
![Başlık (16).png](https://static.wixstatic.com/media/7a5d1a_3d4e90a7170f4d79a867b4b20ab5d807~mv2.png/v1/fill/w_980,h_346,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/Ba%C5%9Fl%C4%B1k%20(16).png)
1935
Murgul mine sites opened for operation by MTA.
1937
Murgul plant turned over to Eti Bank.
1951
Murgul plant opened for operation by Eti Bank.
1973
First firing-up of Samsun Smelter Plant furnaces.
1979
Halıköy mine sites put into operation.
1987
Start of copper concentrate production in Küre.
2004
Eti Bakır acquired from the Privatization Administration and incorporated into Cengiz Holding.
2010
Capacity increase at Murgul 20 MW Hysroelectric Power Plant.
2011
Modernization and electrolysis plant investment at Samsun Smelter Plant.
2018
Mazıdağı Metal Recovery & Integrated Fertilizer Plant started operations subsequent to USD 1.2 billion investment.
bottom of page